Product · Changelog

Release notes

Everything we ship, written for the people who use it. Updated automatically with every release.

v2026.11.22Latest
485Changes
48Releases

v2026.11.22

22 November 2026
1 new3 fixed

Manufacturing

Open app ↗
  • New

    Manufacturing: a Rework order now names what it repairs: the production order that made the faulty goods, or the quality inspection that sent them to rework. The product locks, line 1 is the faulty product, the quantity stays within the source's limit, and at least one repair operation is needed. An inspection with open rework offers Create → Rework Order.#594

  • Fixed

    Manufacturing: when a Rework order repairs a production order, the picker now shows how much of that order is still open to rework (received less what other rework orders already repair), and the quantity is checked against that before saving. An order with nothing left open is no longer offered.#597

Purchases & AP

  • Fixed

    Purchase orders, supplier invoices and supplier credit notes now tax each line at its own rate after its share of the order discount, so the tax rows always add up to the tax total. Goods receipts save each line's share of the order discount. Every amount is rounded to the cent and saved exactly as shown, and a supplier credit note with GL items no longer counts their tax twice.

Sales & AR

Open app ↗
  • Fixed

    Quotations, orders, invoices and credit notes now tax each line at its own rate after its share of the order discount, coupon and promotions; a promotion only lowers the lines it rewards. Total Tax always equals the sum of its per-tax rows, each line shows its own rate, blank rows no longer change the tax, and every amount is rounded to the cent and saved as shown.

v2026.11.21

21 November 2026
2 new2 changed10 fixed

Manufacturing

Open app ↗
  • Changed

    Manufacturing: a production receipt's QC status is now set by the system. When the order's last operation needs inspection, the receipt goes into quality hold until the usage decision and its inspection opens from the receipt. In routings, "QA required" turns inspection on and the plan list shows only plans for the product and step. System-created inspections keep their source and quantity.

  • Changed

    Manufacturing: anyone who can edit quality inspections can now apply the usage decision once approval is done; the override permission is only for deciding before that. The decision now says what happens to each quantity, and a reject or rework asks for the Damage warehouse (and bin) it goes to, plus a reject reason.

  • Fixed

    Manufacturing: the reject reason in Apply Usage Decision now lists only reasons of the new type Quality / defect, which is the only type the server accepts for a reject. Before, it offered scrap reasons, which the server refused. Reason Codes can now create that type, and the decision says where to add one if none exists yet.

  • Fixed

    Manufacturing: the reason on a quality inspection's defect line and a quality plan's on-fail reason now list only Quality / defect reasons, the only type the server accepts there. Before, they offered scrap and rework reasons, so the save was refused. Both can be cleared with None, and a reason of another type saved earlier is pointed out on its line.

Purchases & AP

  • Fixed

    Convert to PO from a request for quotation now taxes each purchase order with the supplier's tax override, as a purchase order typed by hand does. The preview shows each order's tax and total including tax, and an order with a line that has no tax group cannot be created until it is set.

  • Fixed

    A supplier invoice raised from goods receipts now opens as tax excluded when its purchase order is, keeps each purchase order line's tax group, and pre-fills only the quantity of each receipt line not yet invoiced, so receipts already partly invoiced can be invoiced together.

  • Fixed

    Choosing Edit on a goods receipt from its view screen now opens the receipt with its lines, and refreshing that page reloads it. Before, the page went blank.

  • Fixed

    A supplier invoice or credit note that takes part of a line now applies the line's fixed discount in proportion: 1 of 6 units with 30.00 off deducts 5.00, not 30.00. Line total, tax and saved figures agree, so these invoices post. A supplier credit note on a discounted line can now be saved; its subtotal is after line discounts and its summary shows what is saved.

Sales & AR

Open app ↗
  • Fixed

    An invoice raised from delivery notes now pre-fills only the quantity of each delivery line that is still open, and will not let you invoice more than that. Before, quantities already invoiced on an earlier invoice were offered again.

  • Fixed

    Quotations, sales orders, invoices, credit notes, purchase orders and supplier documents now tax each line with the customer's or supplier's tax override, or else the item's own tax group, and re-check it when you change the item. A line with no tax group shows "Tax group missing" and the document cannot be saved, instead of using the default tax group.

Inventory & Warehouse

Open app ↗
  • New

    Item categories have two new settings: Batch & expiry (batch tracking, expiry dates, shelf life, batch numbering) and Stock reservation (whether sales orders reserve stock: none, manually or on approval). Items follow their category, and can override either in Item Master. The old Serial numbers, Batches and Expiry dates switches are gone. The import templates have matching columns.

  • Fixed

    Item Category: with Auto-numbering on, a new category's code continues its siblings' numbering - after RTL0018-S021-C069 comes RTL0018-S021-C070, no longer RTL0018-S021-NaN - and a main category no longer gets a code that is already used. If the suggested code turns out to be taken, the next free one is used and the confirmation names it.

  • New

    Goods Receipt records batches and expiry dates for batch-tracked items: click a line's Batch / Expiry cell to enter batch numbers and dates, or split the quantity across batches. A batch with less than the item's minimum shelf life needs the new Receive Short Shelf Life special permission and is audited. Untracked items are unchanged.

Banking & GL

Open app ↗
  • Fixed

    Foreign-currency sales and purchase documents now take the exchange rate effective on the document date, from every saved rate; a pair missing from the latest rates was valued at 1 before. With no rate for that day, the document shows "No exchange rate for … on …" with a link to add one, and cannot be saved. Changing the date fetches that day's rate.

v2026.11.18

18 November 2026
2 new3 changed3 fixed

Manufacturing

Open app ↗
  • Changed

    Quality Inspection: choose Other value… to record a result outside a characteristic's allowed values (it shows Fail). Receipts with nothing left to inspect are no longer offered, and Inspected Qty cannot exceed what is left, produced or confirmed. Receipt inspections are Final, in-process ones name the operation, Inspector is required, and a cleared disposition quantity saves as zero.

  • Fixed

    Production orders can be linked to an open sales order line again. Changing the product now replaces its recipe, asking first if lines were edited. Materials follow the quantity. Saving now needs both warehouses, scheduled dates, the sales order line or project, the version when one is valid, and complete lines. New orders get their dates filled in, and missing standard costs are flagged.

  • Fixed

    Completing a production order with less than ordered now needs a reason and the "Complete or Close Short" permission. Complete and Close wait for draft documents to be posted, and Close also for open inspections and a settled costing. Release and the Materials grid show stock in each component's issue warehouse. The Void dialog shows document names.

  • Fixed

    Production order and BOM warehouse pickers now offer only fitting types: virtual, main or distribution for work in progress; main or distribution for finished goods and component issue. The version picker offers only versions valid for the order's date, quantity and variant. BOM units must be the item's own. Operations show confirmed minutes and the quantity done.

  • New

    A manufacturing document's view now offers its next step and a More menu, and lists its linked documents: where it came from, what was made from it (marked when created automatically) and the order's other documents. Posted or closed documents say Open, not Edit. New row steps: return one issue, receive a final confirmation, open an inspection.

  • Changed

    Manufacturing: issuing, confirming or receiving beyond the tolerance now needs its Beyond Tolerance permission, which no role has until an administrator grants it in User Roles (Administration included). Quality Plans warn when an allowed value reads as a failure, such as Fail. Release warns when an inspection-required operation has no quality plan that applies.

  • Changed

    Manufacturing: the unit cost on a production goods receipt is now read-only. It is set from the product's costing method and labelled "Standard cost" or "Planned cost — adjusted at settlement". The settle target reads "Finished goods", and the Settle dialog says whether the difference goes to the stock on hand or to the variance accounts.

Sales & AR

Open app ↗
  • New

    A sales order's view now has a Production section listing the production orders made for its lines, with each order's line, item, status, and how much has been produced and received. Clicking a production order, there or in the document flow, opens it in Manufacturing.

v2026.11.17

17 November 2026
1 changed1 fixed

Manufacturing

Open app ↗
  • Fixed

    Operation Confirmation shows how much is left on each operation, blocks finished ones, and refuses more than the remainder plus 10% without a new permission. Auto goods receipt works only on the final operation, and Auto-backflush starts on only where there is something to consume. Production Goods Receipt requires the FG warehouse and a bin when it uses bins.

  • Changed

    Operation Confirmation now offers only the operation's work center or another active work center of the same category. Shift is a list of the work center's calendar shifts, filled from the current time and required when the calendar has shifts. Operator lists the operators linked to the work center and is required when it has any.

v2026.11.16

16 November 2026
10 changed9 fixed

Banking & GL

Open app ↗
  • Changed

    Finance screens now appear in your language, including Arabic: the Budget & Cost Centers and Banking & GL hubs (tabs, cards, view sheets, accrual posting), the View GL window, allocation checks, the processing fee preview and journal entry party lists. Counts read correctly, such as "1 transaction exported".

Manufacturing

Open app ↗
  • Changed

    The Manufacturing hub now appears fully in your language, including Arabic: the Maintenance list of manufacturing masters and its groups, the Shop Floor and Maintenance menu items, Customize Columns, and the attachments panel.

  • Fixed

    Product on production and planned orders lists only manufactured items. Create in a manufacturing row menu now shows its follow-up documents. A production order with nothing recorded on it can be cancelled with Cancel Order, and Complete is refused for it. Complete warns when materials were issued but nothing was produced.

  • Fixed

    Material Issue requires two different source and WIP warehouses, a bin on each line when the store uses bins, and stops returns above what was issued. Production order pickers list only orders the screen can use, with search and Load more. Goods Receipt refuses a released order with nothing confirmed. A draft whose post was refused keeps a notice with the reason.

Platform

  • Changed

    Documents now appears in your language, including Arabic: the Documents page, folder and file cards, the new folder, share, move and rename dialogs, the upload panel, the folder activity feed, the Shared Folders card on the dashboard and the public shared-folder page. Times such as "5m ago" and the folder colour and icon names are translated too. A folder with one file now says "1 file".

  • Changed

    File previews now appear in your language, including Arabic: the preview window, PDF, spreadsheet and Word previews, AutoCAD and 3D model viewers, the conversion screen, drawing loading steps and the document print preview. File type names such as "Spreadsheet" or "3D Model" are translated too.

  • Changed

    More of sales, purchasing and manufacturing now appears in your language, including Arabic: discount limit messages and reasons, promotion types, the sales order progress hint, customer policy messages, purchase order preview checks, and the work center icon names and machine counts in the plant designer.

  • Changed

    Sales, purchase and lead entry screens now show their remaining messages in your language, including Arabic: the checks before saving (a missing order, receipt or delivery, quantities above what is still open), the permission that allows or blocks them, save and email errors, and the invoice choices on credit notes.

  • Changed

    The Sales and Purchase hubs now appear fully in your language, including Arabic: lead and quotation messages, export and email messages, Create Delivery and Create Invoice buttons, the lost-reason window and approval levels. Every hub now shows the transaction type in your language, in the list and in the view panel.

  • Changed

    Shared parts of every screen now appear in your language, including Arabic: pickers and their search boxes, date range shortcuts, the text and signature editor, bank statement import, the barcode scanner, search results, the email composer, void buttons, permission tooltips, dialog close buttons and sign-in messages.

  • Changed

    The tags shown next to transaction types in the Sales and Purchase lists (Direct, Progress, Advance, Credited, Consignor) and the split billing amounts and explanations on invoices now appear in your language, including Arabic. The printed invoice keeps its own language setting.

Purchases & AP

  • Fixed

    A supplier credit note raised against an invoice where tax is added on top of the price now saves the correct total. It used to add the tax a second time, so a 1,635 invoice was credited at 1,770. Lines that come from goods receipts also show the variant code again instead of a long internal ID, on every line of the same item, and the code is what gets saved.#562

  • Fixed

    A supplier credit note raised from an invoice now keeps each line in the unit the goods were invoiced in. An item bought by the carton is credited by the carton, with the same conversion and price, instead of switching to Each or Piece, so the stock returned and the amount credited match the invoice, even if the item's units changed since the purchase.#566

  • Fixed

    On a supplier credit note, Select original invoice now also lists invoices saved while no approval was required, which were missing before. A line credited for part of its quantity also keeps the invoice's tax: it no longer shows 0% or "VAT Exempt" in the summary while the total still includes the tax.#570

  • Fixed

    On a customer credit note, the reference invoice search now also lists invoices saved while no approval was required, which were missing before. A supplier invoice raised from a goods receipt now shows each line in the unit it was received in, with that item's own base unit, instead of "EA Each", and keeps the unit's conversion.#571

Sales & AR

Open app ↗
  • Fixed

    Promotions set up by item category now apply on quotations, sales orders and sales invoices. A Buy X get Y, a bundle line or a volume discount chosen by category used to ignore every item in that category, so the screen kept asking for more items even when enough were on the document.

  • Changed

    The Promotions card on quotations, orders and invoices now shows each offer's reward, what counts, how far along the lines are, what to add and when it ends, and why a qualifying offer was not applied. On a promotion, two item categories that share a code are now separate choices, so a promotion covers exactly the categories you pick.

Projects & Tasks

Open app ↗
  • Fixed

    Milestones on the Gantt now show as milestones, including those created from a project template, so the plan no longer looks late. When applying a template, the message now says clearly if task numbers were busy (press Create again) or the template was deactivated. Undo of an applied template no longer mentions removing phases: phases are never touched.#565

  • Fixed

    The Gantt no longer counts links to and from milestones as Out of Sequence when their dates are correct. A milestone takes no time, so a task that starts the day after a milestone, or a milestone on the last day of the task before it, is on time. A plan just created from a project template now shows no false warnings. Links whose dates really are wrong are still counted.#569

v2026.11.15

15 November 2026
1 new2 changed

Projects & Tasks

Open app ↗
  • New

    New Project Templates in the task masters: reusable plans with phases, tasks, subtasks, milestones, links, roles and budget lines. Save any project as a template from its Gantt, then Apply template on another project: pick the start or finish date and a person per role, check the preview with real dates on the project's calendar, and create every task at once. Undo is one click.

  • Changed

    Project Templates now use a task's own fields: each task has a Phase from Task Phases, an Assignee and optional Collaborators, instead of typed roles and phases. When applying a template, keep each person or swap them in one place; anyone who has left must be replaced, so every new task can be edited and saved at once. Applying no longer creates phases.#561

Sales & AR

Open app ↗
  • Changed

    Credit notes against an invoice made from delivery notes or goods receipts no longer lock the warehouse. A customer credit note fills it in from the invoice and lets you send the goods back to another warehouse. A supplier credit note gives every line its own warehouse, filled in from its receipt, so stock that was moved can be returned from where it is now.#558

v2026.11.13

13 November 2026
1 new4 changed1 fixed

Inventory & Warehouse

Open app ↗
  • Fixed

    The Maintenance window on the Inventory & Warehouse page showed technical names such as "maintenance.inventory.moduleName" instead of its title, sections and links, and voided transactions showed a technical name instead of "Void". The location details panel in Warehouse Locations did the same for "Level" and "Status". All now show proper text in English and Arabic.

  • Changed

    Item Categories now appear fully in your language, including Arabic: the category form, costing methods and their explanations, GL account and cost center sections, and every message. So do the item variant editor and variant matrix, and the line items of a stock adjustment's view. Counts read correctly for one, such as "1 bin selected".

  • Changed

    The 3D Warehouse now appears fully in your language, including Arabic: item and location search, the item locator and bin tour, the occupancy legend, layer switches, and the location details panel with its counts, capacity and allocated items. Counts read correctly for one, such as "1 bin".

Projects & Tasks

Open app ↗
  • Changed

    Gantt Schedule options are now saved for the project, not per browser, so every planner and a customer's shared link see the same work week, holidays and critical path. Tick the work days to set the week. Everyone can view the options; only roles with Manage Project Schedule can change them, and Apply schedule and Set baseline are hidden from other roles.

  • Changed

    Apply schedule and Set baseline on the Gantt now save all the chosen tasks together: if one task can't be saved, nothing changes and that task is named, so a project is never left half re-planned. Changing a predecessor's link type or lag in the task window now changes the link in place instead of removing and re-adding it.

  • New

    Tasks can now be linked to the project budget. A new Budget section in the task window (and in Create, once a project is chosen) adds cost and revenue lines from the project's approved budget, each as a percentage of the line or a fixed amount. Each line shows what is left; one taken beyond its budget turns orange but still saves. Needs the Budget view permission.

v2026.11.12

12 November 2026
2 new6 changed4 fixed

Reports & Analysis

Open app ↗
  • Changed

    The Report Center and the report screen now appear in your language, including Arabic: the headings and buttons, the summary cards, the chart titles, the save and customize panels, the export and schedule messages, and the row counts under every table, which now read naturally in Arabic, such as 38 accounts in 5 classes.

  • Changed

    The panel that opens when you click a figure in a report now appears in your language, including Arabic: its buttons, the scope line, whether the rows reconcile with the figure you clicked, the document and account names, and the messages explaining why a figure cannot be broken down. The row count at the top of a report and the Standard label beside its name are now translated too.

  • Changed

    The Report Builder now appears in your language, including Arabic: choosing a data source, the field list, rows, totals and columns across, filters and their conditions, figures from other sources, calculated columns, notes and highlights, the live preview and the chart options. The total and average lines under a report table are translated too, including on shared report links.

  • Changed

    DNA Intelligence in Reports now appears in your language, including Arabic: example questions, greeting, welcome, the input box, limit and error messages, the table footer and copy buttons. Its header and input box are translated in DNA Assist too. Reports also translate the Detail Level options, "Filter by" prompts, schedule wording, export limits and share-link expiry.

  • Fixed

    In DNA Intelligence, the small label above each answer that reads from your data now appears in Arabic when Arabic is selected, instead of staying in English.

Projects & Tasks

Open app ↗
  • Fixed

    Projects Gantt figures now match Primavera P6: Out of Sequence counts lag in work days and actual dates, finished tasks show actual dates as entered, and Project Timeline counts days inclusively to the data date, weights progress by work done, and says Completed when all tasks are done. A task created as In Progress, Review or Done keeps its actual dates and progress.

  • Changed

    Task progress is now entered, as in Primavera P6: for In Progress or Review work, type % complete or drag the slider, with the planned % by the data date beside it and Use planned to copy it. Moving a card no longer sets 50%. Project Timeline now says On Track when the forecast finish is on the plan, and At Risk only near the project end date.

  • Fixed

    Moving a task back to To Do now clears its actual start and end, so the Gantt treats it as not started again. Leaving Done now clears the actual end on every screen, not only Kanban, and clearing an actual date in the task window now saves. A task moved straight to Review gets an actual start.

  • New

    Share a project's Gantt with your customer. Share on the Gantt makes a link the customer opens without signing in: a live, view-only page with progress, forecast finish, phases, the chart and the next two weeks. Choose whether it shows who is assigned, the baseline and the critical path, and preview it first.

  • Fixed

    On a shared project page, the marker of the phase in progress is now shown whole; its ring and pulse were cut off at the top and the start. A task's card now labels the baseline dates "Baseline" instead of "Show the baseline".

  • New

    The Projects Gantt chart now reaches the bottom of the window on any screen, with no empty band under it, and so does the chart on a shared project page. A new Full screen button at the end of the chart's toolbar moves the menu, the top bar and the page header out of the way so the chart fills the window. Press Esc or the button again to come back.

Inventory & Warehouse

Open app ↗
  • Changed

    The Inventory & Warehouse page now appears in your language, including Arabic: tabs, summary cards, the New Transaction dialog, row menus, statuses, every section of the transaction view and its messages. Stock transfers, adjustments and cycle counts show your company's names for them if they were renamed.

v2026.11.11

11 November 2026
3 new2 changed4 fixed

Manufacturing

Open app ↗
  • Changed

    Planning Run messages now appear in your language, including Arabic: every exception the planning engine writes, such as Bring forward, Not suggested and the lot-sizing fallbacks, and why a demand is not covered. A failed run says what to do next, with the technical details folded underneath for support, and the run summary names the warehouse instead of showing an internal ID.

Sales & AR

Open app ↗
  • Fixed

    Removing a line discount on a quotation, sales order, sales invoice or credit note now puts the line back to full price straight away. Before, the discount label disappeared but the old discount was still taken off the line total, the tax and the document total until the line was deleted and added again.

Platform

  • Changed

    The home page now follows your language, including Arabic: widget titles and descriptions, Customize Dashboard categories, the labels inside every widget, month names on charts and the save messages. Search, the offline badge, update and install prompts, the access-denied page, change history and the sign-in widgets are translated too.

  • Fixed

    On the home page, the Revenue Stats and Quotations Stats trend line no longer reads "from last from last month". In Arabic, the Pending Approvals, Pending Orders and Progress Invoicing Status widgets, statuses such as On Time, Delayed and Processed, the Budget vs Actual rows, and the dates on tasks, events, approvals and the next payment now follow your language.

Projects & Tasks

Open app ↗
  • New

    The Gantt chart now schedules like Primavera P6. Schedule options set the data date, work week, holidays and what counts as critical. Schedule analysis runs the 14-point schedule check, shows earned value in hours and a risk simulation with 50, 80 and 90% finish dates, and lists each task's float, with CSV and MS Project downloads. Apply schedule and Set baseline update the plan.

  • Fixed

    When you save a task, a dependency that would make a loop is no longer dropped silently: the message names it, and the task and its other dependencies still save. A link that fails for any other reason is reported too. Tasks can now be marked Critical, above Urgent, shown in red.

  • New

    A new special permission, Manage Project Schedule, controls who may change a project's schedule on Projects Gantt: Schedule options, Apply schedule and Set baseline. Administrators find it in User Roles, on the Task row's gear icon, beside Backdate Task. Existing roles keep these actions until it is switched off. Schedule analysis stays open to everyone who can see the Gantt.

  • Fixed

    Progress bars fill again. On Projects Gantt, the Critical Path bars show their share (they stayed empty at any percentage), and the task window's Actual progress shows the task's real progress instead of 0% for every task. On the Budget vs Actual tab, the quarter status chips are tinted again.

  • New

    In the task window, each dependency now has a link type (finish to start, start to start, finish to finish or start to finish) and a lag in days, and the reading view lists them. The Gantt chart can show the forecast under each planned bar, total float after it (red when negative), and trace a task's whole chain of predecessors and successors.

v2026.11.10

10 November 2026
16 changed12 fixed

Platform

  • Changed

    On a phone, the top bar now matches the desktop: round glass buttons for Home, DNA Assist and your account, which opens the same menu as on desktop. DNA Assist moved there from the right edge of the screen. Both bars slide away while you scroll down and come back when you scroll up; inside a transaction the bottom bar stays hidden and the Save bar sits at the bottom.

  • Changed

    Your profile photo in the top bar now fills its circle with no frame, on phone and desktop. On a phone the top bar no longer shows the logo, and the Dashboard's two round buttons are replaced by a single Edit button that opens Customize Dashboard, where you now also choose the density.

  • Changed

    Pop-ups now share one look in light and dark mode: the same frame, segmented tabs, grouped lists with thin dividers, round check marks, grey tags and dot statuses. Column Management is laid out like Customize Dashboard, and the delivery-note and goods-receipt pickers use round check marks and dot statuses. Nothing moved or was renamed.#502

  • Fixed

    Voiding a document dated today no longer says it is "dated in the future". That message now appears only for a document dated after today, which can only be voided on its own date.#495

  • Fixed

    The line counter at the bottom of sales, purchase, stock and material issue documents now uses the right word for the number: "1 line · 1 unit" instead of "1 lines · 1 units", and "3 lines · 12 units" as before.#495

Inventory & Warehouse

Open app ↗
  • Fixed

    The bin picker on Purchase, Sales, Material Issue and Production Goods Receipt lines now shows its prompt, empty-list messages and the "Out of Stock" badge in Arabic for Arabic users.#495

Manufacturing

Open app ↗
  • Fixed

    The cost center, project and costing structure pickers now show their prompt, empty-list messages, the "None" option and the cost center type (Overhead, Project, Phase, Activity, Resource) in Arabic for Arabic users.#495

  • Fixed

    Screen readers now announce the work center, operator / resource, reason and warehouse pickers on Operation Confirmation and Material Issue by their label (for example "Work Center"), not by the "Select..." prompt inside them.#495

  • Changed

    Manufacturing documents now change status from the list, like Sales and Purchase. Hover a row for its next step, or open its menu for every allowed one: Firm, Convert, Release, Complete, Close, Provide Components, Receive Goods, Apply or Cancel Change, Usage Decision, Settle, Convert Suggestions. Each asks first and keeps its approval and permission checks.

  • Removed

    Planned orders, production orders, subcontracting orders, change orders and planning runs no longer have status or convert buttons inside the document: use the document's row in the Manufacturing list. A subcontracting order's Receipt Tracking now shows ordered, received and open quantities, and a planning run's results are read-only.

  • Changed

    Material Issue has the new document look of Sales and Purchase, in English and Arabic: the production order in a Source section, the components in one grid with bin and batch, a side panel listing what is still missing, and Save issue in the bar at the bottom (Ctrl+S). A user who may only view sees the issue read-only.

  • Changed

    Operation Confirmation has the new document look of Sales and Purchase, in English and Arabic: clear sections, a side panel with the good / scrap / rework split and what is still missing, and Save confirmation in the bottom bar (Ctrl+S). Saved quantities show as typed (5, not 5.000000), and a user who may only view sees the confirmation read-only.#495

  • Changed

    Planned Order now looks and works like every other document: sections you can jump to, a summary on the right, and Before you can save, which takes you to anything missing. It is fully in Arabic, a new order is dated by your own clock, and the planning-run picker works with the keyboard. Warehouse, item and version pickers also speak Arabic.

  • Changed

    Production Costing has the new document look of Sales and Purchase, in English and Arabic: a side panel with the actual cost split by component, the variance and the WIP balance, and Save costing in the bottom bar (Ctrl+S). Settle Order has moved to the costing's row menu on the Manufacturing list and uses the saved settlement. A view-only user sees the costing read-only.#495

  • Changed

    Production Goods Receipt has the new document look of Sales and Purchase, in English and Arabic: the production order in a Source section, co- and by-products in one grid, a side panel with the order's progress (already received, this receipt, still open) and what is still missing, and Save receipt in the bottom bar (Ctrl+S). A user who may only view sees the receipt read-only.#495

  • Changed

    Production Order now looks and works like every other document: sections you can jump to, a summary with the schedule, planned cost and shop-floor progress, and Before you can save, which takes you to anything missing. It is fully in Arabic, a new order is dated by your own clock, saved quantities show as typed, and a material short of stock is flagged.

  • Changed

    Subcontracting Order now looks and works like every other document, with sections, a summary and Before you can save, fully in Arabic. Linking a production order lists only orders that can be subcontracted. Provide Components now sends each line's required quantity; it sent 0. The grid shows what was dispatched instead of an editable box the server ignored.

  • Fixed

    The warehouse, item, variant, production version and sales-order line pickers now show their prompts and empty-list messages in Arabic for Arabic users.#495

  • Fixed

    The work center, operator / resource and reason code pickers now show their prompts, empty-list messages and type words in Arabic for Arabic users.#495

  • Changed

    Engineering Change Order now looks and works like every other document, with sections, a summary and Before you can save, fully in Arabic. The impact analysis now lists the affected production orders, which open with a click, and where the BOM or routing is used. The cost impact shows in your home currency, and a blocked change says why.

  • Changed

    On an Engineering Change Order, Modify and Remove now list only the components of the chosen BOM, or the operations of the chosen routing. The current value fills in by itself from the BOM, and the new value is entered as a number, a list or a picker to match what you change. Save says which line names an item the BOM does not have.

  • Fixed

    On Production Goods Receipt, screen readers now announce the item picker in the co- and by-products grid as "Item" together with the chosen item, instead of only "Select item...".#495

  • Changed

    Planning Run now looks and works like every other document, fully in Arabic. A saved run opens on its results: suggested orders show which ones are already converted, exceptions list critical problems first with a Needs attention filter, and pegging shows the demand nothing covers. A failed or cancelled run says why.

  • Changed

    Quality Inspection now has the same document look as Sales and Purchase, in English and Arabic: a Source section, characteristics and defects grids, a disposition section, and a side panel with the result, the disposition split and what is still missing. Apply Usage Decision moved to the inspection's row menu on the Manufacturing list. Only posted goods receipts can be picked.#495

  • Fixed

    The quality plan and user pickers now show their prompt, loading and empty-list messages and the "None" option in Arabic for Arabic users. The quality plan list names each plan's stage (Final, In-process, First-article) instead of its internal code.#495

Projects & Tasks

Open app ↗
  • Changed

    The Gantt chart has the new design. Task names and bars scroll together, the header shows every week, and phases fold with a summary bar. Wider screens show start, finish and days. Overdue tasks show how late they are; out-of-order links are dashed. Zoom by Day, Week, Month or Quarter, highlight the critical path or show the baseline, and hover a task for details. Arabic runs right to left.

  • Fixed

    The Gantt critical path now follows your task links and recalculates from today, the way Primavera P6 does: late work moves to today and pushes everything linked after it. The Summary shows the forecast finish, days late, and float to the project end date, which turns negative when the date will be missed.

  • Fixed

    The Project filter on My Tasks, Team Tasks, Kanban and Calendar now lists the chosen project's tasks. Task screens stay fast with thousands of tasks: lists show 50 at a time and load more as you scroll, Kanban columns load 30 cards at a time, and the Calendar reads only the dates on screen.

Sales & AR

Open app ↗
  • Fixed

    Sharing, printing or downloading a document from the message shown after saving now includes its custom fields, the same as sharing it from the list. This applies to quotations, sales orders, delivery notes, sales invoices, credit notes, customer payments, purchase orders and supplier payments.#504

Showing 10 of 48 releases