- Fixed
The cost center, project and costing structure pickers now show their prompt, empty-list messages, the "None" option and the cost center type (Overhead, Project, Phase, Activity, Resource) in Arabic for Arabic users.#495
- Fixed
Screen readers now announce the work center, operator / resource, reason and warehouse pickers on Operation Confirmation and Material Issue by their label (for example "Work Center"), not by the "Select..." prompt inside them.#495
- Changed
Manufacturing documents now change status from the list, like Sales and Purchase. Hover a row for its next step, or open its menu for every allowed one: Firm, Convert, Release, Complete, Close, Provide Components, Receive Goods, Apply or Cancel Change, Usage Decision, Settle, Convert Suggestions. Each asks first and keeps its approval and permission checks.
- Removed
Planned orders, production orders, subcontracting orders, change orders and planning runs no longer have status or convert buttons inside the document: use the document's row in the Manufacturing list. A subcontracting order's Receipt Tracking now shows ordered, received and open quantities, and a planning run's results are read-only.
- Changed
Material Issue has the new document look of Sales and Purchase, in English and Arabic: the production order in a Source section, the components in one grid with bin and batch, a side panel listing what is still missing, and Save issue in the bar at the bottom (Ctrl+S). A user who may only view sees the issue read-only.
- Changed
Operation Confirmation has the new document look of Sales and Purchase, in English and Arabic: clear sections, a side panel with the good / scrap / rework split and what is still missing, and Save confirmation in the bottom bar (Ctrl+S). Saved quantities show as typed (5, not 5.000000), and a user who may only view sees the confirmation read-only.#495
- Changed
Planned Order now looks and works like every other document: sections you can jump to, a summary on the right, and Before you can save, which takes you to anything missing. It is fully in Arabic, a new order is dated by your own clock, and the planning-run picker works with the keyboard. Warehouse, item and version pickers also speak Arabic.
- Changed
Production Costing has the new document look of Sales and Purchase, in English and Arabic: a side panel with the actual cost split by component, the variance and the WIP balance, and Save costing in the bottom bar (Ctrl+S). Settle Order has moved to the costing's row menu on the Manufacturing list and uses the saved settlement. A view-only user sees the costing read-only.#495
- Changed
Production Goods Receipt has the new document look of Sales and Purchase, in English and Arabic: the production order in a Source section, co- and by-products in one grid, a side panel with the order's progress (already received, this receipt, still open) and what is still missing, and Save receipt in the bottom bar (Ctrl+S). A user who may only view sees the receipt read-only.#495
- Changed
Production Order now looks and works like every other document: sections you can jump to, a summary with the schedule, planned cost and shop-floor progress, and Before you can save, which takes you to anything missing. It is fully in Arabic, a new order is dated by your own clock, saved quantities show as typed, and a material short of stock is flagged.
- Changed
Subcontracting Order now looks and works like every other document, with sections, a summary and Before you can save, fully in Arabic. Linking a production order lists only orders that can be subcontracted. Provide Components now sends each line's required quantity; it sent 0. The grid shows what was dispatched instead of an editable box the server ignored.
- Fixed
The warehouse, item, variant, production version and sales-order line pickers now show their prompts and empty-list messages in Arabic for Arabic users.#495
- Fixed
The work center, operator / resource and reason code pickers now show their prompts, empty-list messages and type words in Arabic for Arabic users.#495
- Changed
Engineering Change Order now looks and works like every other document, with sections, a summary and Before you can save, fully in Arabic. The impact analysis now lists the affected production orders, which open with a click, and where the BOM or routing is used. The cost impact shows in your home currency, and a blocked change says why.
- Changed
On an Engineering Change Order, Modify and Remove now list only the components of the chosen BOM, or the operations of the chosen routing. The current value fills in by itself from the BOM, and the new value is entered as a number, a list or a picker to match what you change. Save says which line names an item the BOM does not have.
- Fixed
On Production Goods Receipt, screen readers now announce the item picker in the co- and by-products grid as "Item" together with the chosen item, instead of only "Select item...".#495
- Changed
Planning Run now looks and works like every other document, fully in Arabic. A saved run opens on its results: suggested orders show which ones are already converted, exceptions list critical problems first with a Needs attention filter, and pegging shows the demand nothing covers. A failed or cancelled run says why.
- Changed
Quality Inspection now has the same document look as Sales and Purchase, in English and Arabic: a Source section, characteristics and defects grids, a disposition section, and a side panel with the result, the disposition split and what is still missing. Apply Usage Decision moved to the inspection's row menu on the Manufacturing list. Only posted goods receipts can be picked.#495
- Fixed
The quality plan and user pickers now show their prompt, loading and empty-list messages and the "None" option in Arabic for Arabic users. The quality plan list names each plan's stage (Final, In-process, First-article) instead of its internal code.#495