Product · Changelog

v2026.11.18

Released 18 November 2026 · 6 changes across 1 modules

1New
2Changed
3Fixed
18 November 2026
1 new2 changed3 fixed

Manufacturing

Open app ↗
  • Changed

    Quality Inspection: choose Other value… to record a result outside a characteristic's allowed values (it shows Fail). Receipts with nothing left to inspect are no longer offered, and Inspected Qty cannot exceed what is left, produced or confirmed. Receipt inspections are Final, in-process ones name the operation, Inspector is required, and a cleared disposition quantity saves as zero.

  • Fixed

    Production orders can be linked to an open sales order line again. Changing the product now replaces its recipe, asking first if lines were edited. Materials follow the quantity. Saving now needs both warehouses, scheduled dates, the sales order line or project, the version when one is valid, and complete lines. New orders get their dates filled in, and missing standard costs are flagged.

  • Fixed

    Completing a production order with less than ordered now needs a reason and the "Complete or Close Short" permission. Complete and Close wait for draft documents to be posted, and Close also for open inspections and a settled costing. Release and the Materials grid show stock in each component's issue warehouse. The Void dialog shows document names.

  • Fixed

    Production order and BOM warehouse pickers now offer only fitting types: virtual, main or distribution for work in progress; main or distribution for finished goods and component issue. The version picker offers only versions valid for the order's date, quantity and variant. BOM units must be the item's own. Operations show confirmed minutes and the quantity done.

  • New

    A manufacturing document's view now offers its next step and a More menu, and lists its linked documents: where it came from, what was made from it (marked when created automatically) and the order's other documents. Posted or closed documents say Open, not Edit. New row steps: return one issue, receive a final confirmation, open an inspection.

  • Changed

    Manufacturing: issuing, confirming or receiving beyond the tolerance now needs its Beyond Tolerance permission, which no role has until an administrator grants it in User Roles (Administration included). Quality Plans warn when an allowed value reads as a failure, such as Fail. Release warns when an inspection-required operation has no quality plan that applies.